Year of construction: 2018, biological methanation; nominal capacity 35 Nm³, output 0.7 MWe, synthetic biomethane, bioreactor designed for 50 Nm³/h CO2, 600-litre starter culture in IBC container, modular design incl. reactor, gas unit, process liquid, analytics, electrical system, pilot plant
Location: Stadtwerke, M.-Weingärtner-Str. 11, 85276 PAF
category: Other